Membrane Removal |
||
![]() |
SPT's hot applied membrane removal
system is done in two parts. The first part of the system uses carbide
tipped teeth. The equipment is skid steer powered, allowing for superior
maneuverability. This part removes the bulk of the material; only a thin
transparent stain is left. SPT's Turbo-shotblasting then blasts off the remaining stain for a superiorly clean surface to apply a new membrane, or whatever the job calls for. Production capabilities range from 5,000 - 10,000 square feet per day, depending on material, surface, aggregate material, etc. |
![]() |
![]() |
![]() |
|